Make sure the edges are properly sealed to prevent air from escaping.
Subfloor prep for vinyl flooring.
The first thing to do when installing a vinyl floor is to thoroughly inspect the existing floor.
Measure carefully to ensure that the plywood is an appropriate fit.
If it is easy to pull up your subfloor has too much moisture for vinyl.
Here s a step by step guide to help you prepare a wood subfloor for luxury vinyl.
We therefore recommend taking plenty of time for a thorough preparation.
You can have these pieces cut by a lumber yard or use a circular saw on the job site.
I know i need to get the carpet padding and any staples debris cleaned up before laying the vinyl but do i need to do any other prep work on the plywood subfloor ie.
Any bumps or irregularities in the subfloor will cause problems later on in the process.
After 72 hours pull the tape off the floor.
The moisture levels in concrete subfloors should be as low as possible before installing vinyl flooring.
What s more installing plywood underlayment in the vinyl areas supplies the elevation smoothness and levelness necessary for the proper installation of vinyl floors.
Seal in the edges so no air can escape.
Cover your existing subfloor area where new vinyl flooring will be installed with 1 4 inch plywood.
Another way to measure the moisture in a concrete subfloor is to tape a piece of your scrap vinyl to the floor using duct tape.
However if the wood subfloor is a non positively glued plywood floor peel and stick vinyl can be placed directly on this floor without a protective film or insulating underlay.
Secure the plywood to the subfloor at 6 inch intervals with 1 inch deck screws placed along the edges.
Tape a small piece of scrap vinyl to your subfloor.
Allow 1 4 inch gap along the walls and between the joints for expansion.
Here is a simple guide to test the moisture level yourself.
Fill cracks between sheets of plywood etc.
First of all remove all existing soft floor covering such as carpeting felt and vinyl.